Auto adjust the duration of workshop job
planned
This post was marked as
planned
This post was marked as
in progress
This post was marked as
planned
This post was marked as
in progress
This post was marked as
planned
This post was marked as
in progress
This post was marked as
planned
This post was marked as
in progress
Suzy Weightman
Merged in a post:
New workshop "service" product type
A
AndyA. Office
Would it be possible to have a new product type (or add parameters to existing non-inventory products) to give a job a pre-determined amount of workshop time. For example, you could create a product for a Silver Service and give it a work shop time of 3 hours. Then when it's booked in it automatically creates a block of three hours and prevent it being dropped in to the calendar if there isn't a slot big enough.
Suzy Weightman
Hi all,
My proposal for this is that we'll add a new field which can be set against items, "Workshop Time".
This will allow you to set a time value against labor items, and when the job is scheduled we'll calculate the total time based on those values - if there aren't any set, we'll default to the standard 1 hour.
We'll likely still allow for these to be adjusted as required after scheduling.
Thanks,
Suzy
P
PM
Suzy Weightman another option is to assign a time to a cost for example £ = "x" time, anything within the labour department/catagory would pull this through so if you added 3 jobs from the labour category at £20 each then that will allocate on the workshop calendar time ="X times 60"
Suzy Weightman
PM Hi,
That sounds like a good idea, we'd still need configuration setup for the Dept/Cat that people want to use so we're not "guessing" at the labour category.
We'd likely need to allow a list of categories as well as I think one will be too restrictive.
So we'd need a list of categories, and then a configuration setting for £/$ to Time ratio?
Suzy